news

News / News-Details

Security filter helps the coal-to-olefins project product information

DATE:2022-05-04 Number of views: 1 Source:1

Security filter helps the world’s largest coal-to-olefins project

Product Information

1. The filter element has uniform pore size, high strength and high temperature resistance;

2. Can effectively remove suspended solids, rust, etc. in liquid;

3. The filter element material has high cleanliness, no pollution, and is resistant to acid and alkali and other chemical solvents;

4. Small size, large filtering area, low resistance and long service life;

5. Made of stainless steel and can also be made according to user requirements;

6. Internally, tubular filter elements such as PP melt-blown, wire-fired, pleated, titanium filter elements, and activated carbon filter elements are used as filter elements. Different filter elements are selected according to different filter media and design processes to meet the requirements of effluent quality.

IMG_3853

Project Proposals

1.Project Overview

A new materials company's first phase of 2600000 t/h coal-to-olefins and supporting 400000 t/h green hydrogen coupling to olefins project.

The first phase investment is RMB 47.8 billion, covering an area of 594.43 hectares. It adopts a collaborative production process integrating green hydrogen and modern coal chemical industry. It is currently the largest coal-to-olefins plant in the world and the only one in the world that uses green hydrogen to replace fossil energy production on a large scale. Alkenes Project.

2.Process System Flow

1)Demineralized water system: multi-media filter + ultrafiltration + secondary reverse osmosis + electric desalination (EDI), with a designed maximum water production capacity of 2700t/h.

2)Turbine condensate refining system: iron removal filter + front positive bed + mixed bed system, with a processing capacity of 1650t/h.

3)Air separation turbine condensate: iron removal filter, processing capacity 1400t/h.

4)Process condensate refining system: activated carbon filter + iron removal filter + front positive bed + mixed bed treatment system, with a processing capacity of 1925t/h.